Hangar Watch - Tuesday 26 March 2013

Work has continued on erecting the main steel frame of the aircraft maintenance bays
of the new Monarch Aircraft Engineering Hangar with the outline of the south bay now
visible - there will be two side by side bays - the structure in the foreground is the
offices/service areas that will be at the back of the Hangar....

.... a wider view showing the whole Hangar construction site as it stands

..... and a view of the whole site with the Monarch Hangar on the left, the asphalt
Batching plant for the Runway extension/A45 diversion project, the Eurojet Hangar
and the Elmdon Building on the far right of the photo